Agrotecnica International in 2021/22 built a complete sludge receiving, storage, and pumping system for the Cremona (A2A) waste-to-energy plant. The package includes two sludge receiving bunkers (both 120 m³), two piston pumps, tubing from the pumps to the furnaces and the necessary control boxes.